This project involved the construction of a new operating room within the existing operating suite of the hospital.  Our team coordinated all aspects of this project:  demolition; dust, debris & noise control; structural steel reinforcement; installation of medical gases, HVAC ducts, sprinkler; plumbing; electrical, and all interior finishes.

We were successful in completing this project while allowing the existing operating rooms to remain in service throughout the duration of the project.  During construction we maintained a negative air seal around the work area, which prevented contaminants from migrating into the sterile areas of the operating suite.  This project required intense supervision in order to maintain a high level of quality control.

 

 

 

Category
 
Retail | Commercial - Industrial
3 of 17
Job Specifications

Owners: Gifford Medical Center
Project Size: 450 SF
Completion: Fall 2009
Contract Type: General Contract
Architect: Joe Greene, AIA
Location: Randolph, VT

 

 

 

278 South Main Street, Suite #3
St. Albans, Vermont 05478
Tel: 802-527-1955
Fax: 802-527-1919

stalbans@connorcontractinginc.com

1100 U.S. Route 2
Berlin, Vermont 05602
Tel: 802-223-3843
Fax: 802-223-3888
berlin@connorcontractinginc.com